Canadian company · headquartered in Vancouver, BC (604) 632-4959 Text us Ali@Sedighi.ca

Where we work

HVAC news and marketing in Quebec

Quebec is Canada's most electrically heated province and its largest heat pump market by additions. RBQ licensing, CCQ certification and French-language rules shape how a contractor operates and advertises.

Written by Ali Sedighi, MBALast updated:

Quebec is the most electrically heated province in Canada. Statistics Canada puts electricity at 70% of Quebec households' primary heating in 2023; gas was 5% and wood 4%. Quebec also accounted for 36% of all residential heat pumps added in Canada between 2000 and 2023, according to the Canada Energy Regulator. For contractors, the market is about heat pumps, electric systems and efficiency upgrades, marketed in French.

The market and its buyers

The short answer: a large, electric, heat-pump-literate market where language and licensing come first.

Montréal, Laval and Longueuil form the core metro market, with Québec City, Gatineau, Sherbrooke, Lévis and Saguenay as major regional centres. Many homeowners already know heat pumps well; the questions are about choosing the right unit, sizing for cold snaps, adding zones, and getting grants. Multi-unit and older rental buildings are a large segment, and Hydro-Québec's programs include bonuses for some older multi-unit buildings in designated areas.

Climate and seasonality

Cold, snowy winters and a long heating season, especially outside the St. Lawrence lowlands, keep heating central. Warm summers support cooling demand, which heat pumps serve too. Marketing can run a heating message in fall and winter and a cooling-and-comfort message in late spring, often promoting the same equipment.

Regulators to know

  • The Régie du bâtiment du Québec licenses contractors and oversees building safety, including gas, plumbing, electrical and pressure equipment. Hiring an unlicensed subcontractor can expose the general contractor to prosecution.
  • The Commission de la construction du Québec certifies the competency of the people who work on construction sites, HVAC workers included.
  • The CNESST for workplace health and safety.
  • The OQLF for French-language obligations in business.

We link these bodies and don't interpret their rules.

Programs as of October 2026

  • LogisVert. Hydro-Québec's program pays $50 per 1,000 BTU/h at -8°C for ENERGY STAR heat pumps, or $120 for cold-climate units, up to $6,700, plus geothermal and other measures. Hydro-Québec notes the federal rebate coming in 2027 and says LogisVert requests are being processed normally.
  • Rénoclimat. From October 1, 2026, the pre-retrofit evaluation became optional and new caps apply, per Québec.ca. Participants under the old rules must finish by March 31, 2027.
  • Chauffez vert stopped accepting applications after March 31, 2026.
  • CGHAP agreement, announced June 29, 2026: $243.5 million for about 25,000 households, covered in our story.

What we're watching in Quebec

Hydro-Québec's statement that LogisVert requests are processed normally despite the coming federal rebate is the line we are watching most closely. If the two programs end up stacking, or if LogisVert adjusts its amounts, Quebec contractors' quotes will change. We are also watching the Rénoclimat transition, with old-rule participants due to finish by March 31, 2027, and the delivery program for Quebec's $243.5 million CGHAP agreement, whose name the federal backgrounder did not give. Each development will be dated in our newsroom.

For marketing, the practical consequence is that Quebec rebate pages need closer maintenance than most. A page that combines LogisVert, Rénoclimat and the federal rebate should show a separate "as of" date for each.

How we'd approach marketing in Quebec

  1. French first. French-language pages, ads and Google Business Profile content as the default, with English as an addition where useful. We plan and confirm language scope in each proposal.
  2. Licence numbers up front. Show your RBQ licence clearly; Quebec homeowners are used to checking.
  3. Explain LogisVert maths. A page that shows how capacity at -8°C drives the grant helps buyers compare quotes, and few contractors explain it.
  4. Separate multi-unit content. Owners of older buildings face different programs and decisions.
  5. Keep Rénoclimat pages dated. The October 2026 changes make older pages wrong.

See our program pages service and results, or call, text or email through the contact page. We are a marketing service, not an HVAC contractor.

Frequently asked questions

Do HVAC contractors in Quebec need an RBQ licence?

Anyone who does construction work for others, or has it done, needs an RBQ licence with the right subclasses unless exempted. Check the RBQ for the subclasses that apply to your work.

Must a Quebec contractor's website be in French?

Quebec's language rules require French to be clearly predominant in commercial advertising, and website content for Quebec customers must be available in French. See the OQLF for details.

How does LogisVert calculate heat pump grants?

As of October 2026, Hydro-Québec lists $50 per 1,000 BTU/h of capacity at -8°C for ENERGY STAR heat pumps, or $120 for cold-climate units, up to $6,700. Confirm current terms with Hydro-Québec.

Sources

  1. Régie du bâtiment du Québec (RBQ) (2026-10-22)
  2. Commission de la construction du Québec (CCQ) (2026-10-22)
  3. CNESST (2026-10-22)
  4. Hydro-Québec: LogisVert (2026-10-22)
  5. Québec.ca: Rénoclimat, what's new (2026-10-22)
  6. OQLF: Francisation des entreprises (2026-10-22)
  7. Statistics Canada Table 38-10-0286-01 (2026-10-22)